Roads & Infrastructure Magazine
The missing link

The establishment of a new SAMI bitumen container facility in Darwin is set to transform bitumen transport and delivery throughout the Northern Territory, offering unprecedented access to essential materials for local projects and businesses.
SAMI Bitumen Technologies’ ‘bitumen container’ is one of the industry’s most significant and recent developments in material logistics.
The SAMI bitumen container is a fully insulated, high‑capacity bitumen container that keeps product hot and mobile, allowing SAMI to deliver hot bitumen efficiently to virtually any location where transport is feasible.
Since the establishment of the service line in 2021-22, the offerings popularity has continued to increase project by project, year by year.
After recognising a legacy industry requirement and a gaping hole in the market, SAMI Bitumen Technologies began advancing plans for a dedicated bitumen supply in the Northern Territory.
The region had traditionally faced its challenges when it came to bitumen supply, predominantly caused by the closing of a local refinery.

As Pierre-Henri Berard, Logistics and Supply Manager – SAMI Bitumen Technologies explains.
“Nobody has been set up in the Northern Territory, it relied purely on external supplies from overseas,” he says.
He says some locations never had on-the-ground staff and resources to leverage from, let alone a reliable and consistent supply of high-quality bitumen.
SAMI Bitumen Technologies already had several bitumen import facilities across Queensland, New South Wales, Victoria and Western Australia, but nothing in the Northern Territory. It wasn’t long before the ball got rolling on the company’s newest ‘Bituhub’ depot in Darwin.
New possibilities
Major works on the brand-new Darwin depot concluded in 2025, providing an additional 3500 tonnes of bitumen stock that will be stationed at the facility.
With a daily capacity of around 300 tonnes ready, each unit is supported by a specifically designed drop-deck skid, helping to simplify handling while also increasing the maximum payload, which sits at around 30 tonnes per container.
A big milestone for the depot was the purchase and commissioning of a 100-tonne reach stacker, increasing ease of movement and interface with trucks on site. One of the biggest challenges faced by the team was weather.
Record rainfall was recorded in the Northern Territory during the project roll-out, meaning delivery relied on local know-how and perseverance, as well as the support of the company’s interstate contacts.



